Custom Exhibit Builder at Mandalay Bay
Mandalay Bay's 2 million sq ft of meeting and exhibit space hosts everything from medical device conferences (HIMSS, ASH) to consumer-brand summits. Carpet-protection rules, casino-property union relationships, and freight logistics differ from LVCC — we know the playbook because we install there almost every month.
Why Nova installs better at Mandalay Bay
Our shop is local to Las Vegas — we install at Mandalay Bay regularly. That means our lead installers know the dock, the freight elevators, the union jurisdictions, and the floor-protection rules. We don't show up needing the venue mapped for us.
- ✓ Same-day fixes are possible — our shop is 12 miles away
- ✓ Direct-to-show delivery during your assigned move-in window
- ✓ Local install crew with venue-specific jurisdiction knowledge
- ✓ Drayage cost reduction through local fabrication
Halls at Mandalay Bay
Bayside Level
Ground-level exhibit halls A, B, C, D — the primary trade-show floor. Dock access via the Mandalay Bay convention loading dock; strict move-in windows.
Shoreline Level
Second-level ballrooms and breakouts — freight elevators required for any hard build. Components must fit within elevator dimensions or ship flat-pack.
Oceanside Ballroom
Column-free 100,000+ sq ft — popular for general sessions and gala buildouts. Carpet is permanent; all builds require protection.
Install playbook: Mandalay Bay
Drayage & material handling
Drayage at Mandalay Bay is billed by the exclusive show contractor (typically Freeman or GES). Rates run in line with LVCC — $135-$210 per 100 lbs. Local direct-shipping from our Vegas shop bypasses the advance warehouse layer.
Dock scheduling
Mandalay Bay has a shared loading dock — move-in windows are enforced hard, and vehicles staging outside their window are turned away and returned to marshaling. Nova crews arrive 30-45 min before window open to secure position.
Union jurisdictions
Same core union roster as LVCC (Carpenters 1780, Teamsters 631, IATSE 720) but with tighter casino-property protocols. Our lead installers hold current relationships with the on-property stewards.
Floor protection
Mandalay Bay convention floors are 100% carpeted permanent installation — any wheeled equipment, castered case, or freight cart must run on a protection path (masonite, ram board, or plywood). Every Nova build ships with the protection path included; no surprise fees from show management.
Rigging & hanging signs
Overhead rigging is IATSE 720, same stamped-drawing threshold as LVCC. Mandalay Bay has additional height restrictions in certain halls (Shoreline ballrooms cap lower than Bayside) — we design against the specific hall assignment.
Fire marshal submissions
Clark County Fire Marshal — same submission rules as LVCC for enclosed/multi-level structures.
Services we deliver at Mandalay Bay
- Custom wood exhibitsCustom wood trade show exhibits fabricated in-house in Las Vegas — premium hardwoods, museum-grade finishes, engineered for the LVCC and Strip convention floor.
- Exhibit designCustom trade show exhibit design in Las Vegas. CAD drawings, 3D renderings, lighting plans, and engineered drawings — done in-house before fabrication starts.
- Install & dismantleTrade show booth install and dismantle in Las Vegas. Nova crews work LVCC, Mandalay Bay, Caesars Forum, Venetian Expo with union and non-union coordination.
- Island boothsCustom island trade show booth fabrication in Las Vegas. Open 4-sided floor plans, hanging signs, double-decks — engineered and built in-house.
Mandalay Bay FAQ
Building at Mandalay Bay?
24-hour quote turnaround. Local shop, local crew, venue-specific playbook.
